TSC AU | Home

Built Around Murdoch

Winthrop was developed in the 1970s and 1980s around Murdoch, and the housing is mostly family homes on quiet streets. Many kitchens are original, with a servery, a laminate bench and a pantry that has never been big enough.

Because the suburb is close to the hospital and the university, some of the housing is rented out, which splits the brief between owners who live there and owners who do not.

Owner-Occupied or Rented

The two briefs are different and it is worth being clear which one applies before anything is specified.

  • Owner-occupied: stone bench, soft-close hardware, storage that works for the long term
  • Rented: durable surfaces, neutral colours, easy-clean flooring
  • Either way: fix the electrical before adding appliances
  • Either way: keep the plumbing where it is unless there is a good reason to move it

The Servery Question

A lot of Winthrop kitchens have a servery opening to the meals area. Keeping it and widening it is often cheaper and better than removing the wall entirely, because it keeps the structure and still connects the rooms.

Widening a servery still needs a lintel. It is a smaller job than removing the wall, but it is not a cosmetic change.

What We Do in Winthrop

Kitchen Renovation

Kitchen renovation in Winthrop, including widening a servery rather than removing the wall.

Kitchen Cabinets

Cabinetry for 1970s and 1980s kitchens, with the pantry rebuilt as working storage.

Hybrid Flooring

Flooring through kitchen and meals areas, chosen for how much traffic the house gets.

Questions we get in Winthrop

Should we widen the servery or remove the wall?

Widening is usually cheaper and keeps the structure. Removing the wall gives a better open-plan result but needs a beam and a permit, so it depends on the budget and the layout.

Can the house be rented out during the work?

It is possible for a cosmetic refresh, but not for a full replacement. If the property is tenanted, the scope and the schedule need to be planned around that from the start.

How long does a Winthrop kitchen take?

A typical replacement runs several weeks on site plus bench lead time. If structural work or a servery change is involved, allow longer for the permit.

Nearby Suburbs

We also work in the suburbs around Winthrop:

Getting a Quote

Tell us whether you live there or rent it out, and send a photo of the servery if there is one. It is usually the decision that shapes the job.

Contact us about a Winthrop renovation →